Excel defect log template
Handle open defects traceably. The log connects finding and action with an owner, a deadline and a controlled closure.
- No registration, no macros
- 50 prepared rows, filters, frozen header
- Instructions on the second worksheet
Sheet layout
Fields and automatic deadline review
Ten columns. Priority and status come from lists; Excel calculates the deadline review.
| A | B | C | D | E | F | G | H | I | J |
|---|---|---|---|---|---|---|---|---|---|
| ID | Site / asset | Defect / action | Priority | Owner | Due date | Status | Closed on | Evidence / reference | Deadline review |
| M-001 | Example North / AHU-001 | Damaged seal; clarify replacement | Medium | Engineering team (fictional) | 20 Nov 2026 | Open | Due soon | ||
| M-002 | Example North / AHU-001 | Cover secured | Low | Engineering team (fictional) | 01 Nov 2026 | Closed | 30 Oct 2026 | Demo-M-002.pdf | Closed |
How the template calculates
- Priority: High, Medium, Low – Status: Open, In progress, Closed
- Open defects: Overdue, Due soon (30-day look-ahead) or Planned
- “Closed” without date or evidence: Check closure
- Duplicate IDs and warning states are highlighted in red
What's in the file
- 50 prepared data rows with filters and a frozen header
- Drop-down lists and input validation
- Instructions on the second worksheet
- No macros, no external links
- A3 landscape print area
Instructions
How to use the defect log
Stable IDs
Replace the examples and give every defect a permanent ID.
Finding and action
Describe them clearly and agree the priority as a team.
Deadline and owner
Agree a deadline; filter by status or deadline review.
Close after review
Enter date and evidence only after the internal review.
In practice
Fictitious example: cover secured again
A team records a loose cover as a defect. After the repair it adds the closure date and an evidence reference; only then does the deadline review show “Closed”.
The original deadline stays visible, so the work does not disappear by simply switching the status to “Closed”.
Spreadsheet or software?
Handle defects with HubDix
Excel
Well suited for
- Manually coordinated defects at one site
- Site walks and handovers
- Getting started with structured defect management
Excel
Limits of a spreadsheet
- No automatic risk assessment
- No cost approval or approval limits
- No feedback from external companies
In HubDix
Defects in HubDix
Origin from maintenance, inspection or project, cost approval without self-approval and external repair with internal confirmation.
View featureFAQ
Questions about the template
Is the template free to use without registration?
Yes. The XLSX file downloads directly, contains no macros and may be adapted for your own operations.
Is the sample data real customer data?
No. All examples are fictitious and must be replaced before productive use.
Does the template assess how urgent a defect is?
No. Priority and deadline are operational inputs. The template does not replace a risk assessment or a decision on immediate measures.
Read on
Related resources
The matching HubDix workflow, guides and further templates.
See HubDix for yourself.
The demo is a complete instance with fictitious sites and data. For questions about your operation, your installations and your processes, write to us.
The demo is set up for hotels – features and handling are the same in every industry.