Preventive maintenance: plan before failure

Preventive maintenance covers planned measures intended to prevent wear and failure. The right scope depends on the installation, its use and expert judgement – not on a sample table.

  • HubDix · Editorial team
  • Published

Which strategy suits the installation?

Preventive means the measure is planned before damage forces it. When it falls due can follow three logics, which often complement each other in practice.

Time-based
Due after a fixed calendar interval, for example annually.
Easy to plan, independent of use.
Usage-based
Due after operating hours, cycles or mileage.
Needs reliable meter or usage data.
Condition-based
Due when observations or measurements indicate it.
Requires regular checks and clear thresholds.

An interval is not an arbitrary number. Take manufacturer documentation, operating conditions and expert requirements into account. A heavily used installation may need different measures from a comparable one that rarely runs.

Build a workable maintenance schedule

A maintenance schedule only becomes executable when every row has a clearly identified installation, an understandable task and a responsible person. At a minimum it includes:

  • Site and unique name of the installation
  • A task worded so the team carrying it out understands the scope
  • The interval and its basis (manufacturer, contract, expert decision)
  • Responsible person and, where applicable, the contractor
  • Last completion, next due date and where the evidence is kept

Allow time for access and coordination. A date without an available installation, spare parts or a responsible person is not yet an executable plan. Record deviations and decisions about replacement dates traceably.

Example: the filter of a ventilation system

Fictitious example

The schedule includes a check according to the requirements defined for this installation. At three consecutive visits the team records heavy contamination and replaces the filter earlier than planned each time.

That is a reason to review the plan with an expert – not proof of a new universal interval. What matters is that the information exists at all: finding, measure and next action. A row saying “done” provides too little.

Improve the schedule based on results

Review regularly what the schedule has achieved in practice. Only compare data with the same meaning – a postponement is not the same as a failure.

  • Which dates were postponed, and why?
  • Which reports are still missing?
  • Which findings recur on the same installation?
  • Which actions resulting from findings are still open?

How HubDix handles recurring maintenance

In HubDix every maintenance item has an interval – eleven levels from six times a year to every ten years. The next due date is the last recorded maintenance plus one interval and is recalculated whenever a history entry is saved, changed or deleted. Each history entry holds the company, outcome, report and any resulting defects.

Maintenance history of a lift installation with a new entry, maintenance company, outcome, a defect with costs and the maintenance report
Maintenance history: outcome, company, report and defects per entry (German UI).

HubDix does not offer sensor-based failure prediction. Its value lies in findings and actions being findable on the record, so decisions about the schedule are based on documented cases.

FAQ

Preventive maintenance

Does preventive maintenance guarantee there will be no failures?

No. Planned measures aim to reduce risk; they cannot rule out failures.

How often should an installation be serviced?

There is no universal answer. Manufacturer documentation, use, contractual agreements and requirements set by experts are decisive.