Free Excel template
Excel maintenance plan template
Plan recurring maintenance clearly: the template connects installation, task, owner, last completion and next due date – and shows by formula what is overdue or due soon.
- No registration, no macros
- 50 prepared rows, filters, frozen header
- Instructions on the second worksheet
Sheet layout
What is included
Ten columns, three of them with formulas. You fill in the yellow cells; Excel calculates the blue ones.
| A | B | C | D | E | F | G | H | I | J |
|---|---|---|---|---|---|---|---|---|---|
| ID | Site / asset | Task | Owner | Last completed | Interval (months) | Next due | Days to due | Due status | Evidence / note |
| W-001 | Example North / AHU-001 | Check filter condition | Engineering team (fictional) | 18 Sep 2026 | 1 | 18 Oct 2026 | -31 | Overdue | Example interval; determine for your asset |
| W-002 | Example South / AHU-002 | Service to agreed work plan | Engineering team (fictional) | 01 Nov 2026 | 3 | 01 Feb 2027 | 75 | Planned | Demo-W-002.pdf |
How the template calculates
- Next due = last completion plus whole calendar months (EDATE)
- Days to due = next due minus the as-of date
- Due status: Missing data, Overdue, Due soon (30-day look-ahead, adjustable) or Planned
- The as-of date uses TODAY() and can be overwritten for a fixed review
What's in the file
- 50 prepared data rows with filters and a frozen header
- Drop-down lists and input validation
- Instructions on the second worksheet
- No macros, no external links
- A3 landscape print area
Instructions
How to use the maintenance plan
Replace the examples
Enter unique installations and specific tasks.
Set the interval
Record the month interval defined by your experts and the last completion.
Check the dates
Compare the calculated date with your planning basis and filter by status.
After the service
Update the last completion and keep the result in the maintenance record.
In practice
Fictitious example
A ventilation unit was serviced on 18 September. With a purely illustrative interval of one month, the formula returns 18 October – as of 18 November the row is overdue.
The example is not an interval recommendation for ventilation units. Different technical rules, for example based on operating hours, need an adapted plan.
Spreadsheet or software?
When a shared digital workflow helps
Excel
Well suited for
- One site, one clearly defined team
- Getting started and taking stock
- A fixed review at a set date
Excel
Limits of a spreadsheet
- Several editors, several file versions
- No reminders to owners
- History is lost when rows are overwritten
In HubDix
Maintenance in HubDix
Due date from interval and history, reminders to owners, the report on the entry and external assignments via link.
View featureFAQ
Questions about the template
Is the template free to use without registration?
Yes. The XLSX file downloads directly, contains no macros and may be adapted for your own operations.
Is the sample data real customer data?
No. All examples are fictitious and must be replaced before productive use.
Does the template include statutory inspection intervals?
No. It calculates with the month interval you enter. Which intervals apply to an installation must be determined by qualified people.
Read on
Related resources
The matching HubDix workflow, guides and further templates.
See HubDix for yourself.
The demo is a complete instance with fictitious sites and data. For questions about your operation, your installations and your processes, write to us.
The demo is set up for hotels – features and handling are the same in every industry.