Free Excel template

Excel maintenance record template

Record what was actually done. The maintenance record separates the work result, finding, follow-up task and internal review – one row per execution.

maintenance-record-en.xlsxXLSX · 14 KB · 2 worksheets
  • No registration, no macros
  • 50 prepared rows, filters, frozen header
  • Instructions on the second worksheet
Download free

Sheet layout

One row per execution

Ten columns without formulas: the record is a history, not a plan. Closed rows stay in place.

maintenance-record-en.xlsx · Worksheet “Plan”Sample values as of 18 Nov 2026
Preview of the worksheet: Excel maintenance record template
ABCDEFGHIJ
DateSite / assetWork performedPerformed byOutcomeFindingFollow-up / ownerFollow-up dateEvidence / referenceInternally reviewed by
01 Nov 2026Example North / AHU-001Filter checkedExample contractor A (fictional)CompletedDamaged sealReview seal / engineering team20 Nov 2026Demo-W-001.pdf
InputFormulaWarning colour in Excel

How the template calculates

  • Outcome from a list: Completed, Partial, Not executable
  • Finding and follow-up have columns of their own
  • Date columns hold real Excel dates with validation
  • Internally reviewed by records the reviewer by name

What's in the file

  • 50 prepared data rows with filters and a frozen header
  • Drop-down lists and input validation
  • Instructions on the second worksheet
  • No macros, no external links
  • A3 landscape print area

Instructions

Keep the history understandable

  1. Be specific

    Name the work actually performed, not just “maintenance”.

  2. Separate findings

    Enter deviations as findings, with follow-up and an owner.

  3. Link evidence

    Refer to a reachable report or photo.

  4. Review internally

    Document the review separately; never overwrite rows.

In practice

Fictitious example: damaged seal

Fictitious example

During an example filter check, a damaged seal is noticed. The check was completed; the finding and the action still needed are recorded separately next to it.

A deputy can see why work remains open despite documented maintenance – and who will handle it by 20 November.

Spreadsheet or software?

From record to connected workflow

Excel

Well suited for

  • Collecting evidence for individual installations
  • A transition until a digital workflow is in place
  • Tracking work by external companies

Excel

Limits of a spreadsheet

  • Manages references, not files
  • No link to the next due date
  • No user permissions

In HubDix

Maintenance history in HubDix

Every entry with company, outcome and report; defects created deliberately from the history, the next due date recalculated.

View feature

FAQ

Questions about the template

Is the template free to use without registration?

Yes. The XLSX file downloads directly, contains no macros and may be adapted for your own operations.

Is the sample data real customer data?

No. All examples are fictitious and must be replaced before productive use.

Does the template include technical checkpoints?

No. It contains no measurements or universal asset checklist. Add the specific scope of work based on the applicable technical requirements.

See HubDix for yourself.

The demo is a complete instance with fictitious sites and data. For questions about your operation, your installations and your processes, write to us.

The demo is set up for hotels – features and handling are the same in every industry.